steel frame building brief introduction
Steel frame is a structure which is made from the organized combination of custom-designed structural steel to meet architecture and engineering requirements of users. Steel structure buildings have two main parts. One is light gauge steel structure as bearing system, through changing its section to meet local wind and snow load condition. Another is insulation panel, doors and windows as its maintenance system.

steel structure building advantages
strong, durable, flexible and customized;
economical, efficient, adaptable and long lasting;
attractive, functional and low cost;
easy to build, energy efficient, and virtually maintenance free;
fast construction in speed, small occupation of land, short construction period;
multiple assembly and disassembly with 100% recycle;

steel frame building applications
warehouses, manufacturing facilities, agricultural buildings, retail stores
plant facilities, sporting facilities, self-storage buildings, fire stations
churches, schools and etc.

specifications of steel frame building

RAQ
Q1: Are you from a factory or trade company?
A1: Henan Tiga Engineering Co.,Ltd is a factory with 15 years export experiences.
Q2: What is the payment term?
A2: Normally 30% T/T as deposit and the balance upon the copy of bill of lading. L/C is also acceptable.
Q3: What about the delivery time?
A3: Normally about 20 days after receiving the deposit.
Q4: Can you provide design and drawings?
A4: Yes, we can. Our skilled engineers can provide design and drawings based on customer's requirements.
Q5: What's the package method?
A5: All products have the standard export seaworthy package.


Steel frame is a structure which is made from the organized combination of custom-designed structural steel to meet architecture and engineering requirements of users. Steel structure buildings have two main parts. One is light gauge steel structure as bearing system, through changing its section to meet local wind and snow load condition. Another is insulation panel, doors and windows as its maintenance system.


steel structure building advantages
strong, durable, flexible and customized;
economical, efficient, adaptable and long lasting;
attractive, functional and low cost;
easy to build, energy efficient, and virtually maintenance free;
fast construction in speed, small occupation of land, short construction period;
multiple assembly and disassembly with 100% recycle;


steel frame building applications
warehouses, manufacturing facilities, agricultural buildings, retail stores
plant facilities, sporting facilities, self-storage buildings, fire stations
churches, schools and etc.


specifications of steel frame building
main construction frame | corner fitting |
high strength bolt (inter-hexagon)--M12,8.8S | |
stand column--3mm steel sheet bending | |
bottom frame--3mm steel sheet bending; C100X45X2.0 | |
top frame--2.5mm steel sheet bending; C100X45X2.0 | |
connection plate(Q235B) | |
roof--1.5mm corrugated steel sheet and 50mm sandwich panel | |
maintenance | wall panel--50/75/100mm EPS sandwich panel |
toilet wall panel--50/75/100mm EPS sandwich panel | |
floor --15mm cement board | |
door & window, accessories | water collecting and drainage --PVC |
aluminum slidding door --W1800*H2050(customized size) | |
toilet sandwich panel door --W700*H1900(customized size) | |
sindow--PVC/aluminum slidding window W500*H600 (customized size) | |
trimming--1.0mm galvanized /0.476mm steel sheet |


Q1: Are you from a factory or trade company?
A1: Henan Tiga Engineering Co.,Ltd is a factory with 15 years export experiences.
Q2: What is the payment term?
A2: Normally 30% T/T as deposit and the balance upon the copy of bill of lading. L/C is also acceptable.
Q3: What about the delivery time?
A3: Normally about 20 days after receiving the deposit.
Q4: Can you provide design and drawings?
A4: Yes, we can. Our skilled engineers can provide design and drawings based on customer's requirements.
Q5: What's the package method?
A5: All products have the standard export seaworthy package.


